Fireproofing and Insulation
in Hays
Commercial fireproofing and insulation in Hays, self-performed. Healthcare, university construction and the agricultural-industrial buildings across western Kansas.
A Hays number that holds
after award.
Bahl Fireproofing has been a commercial fireproofing subcontractor since 1977, working out of Round Rock, Texas. In Hays we self-perform spray-applied fireproofing, intumescent coatings, K-13 sprayed fiber, spray foam and Core-Fill masonry insulation on our own crews and our own equipment.
What we do before we price a Hays job is confirm the adopted code edition and the local amendments with the authority having jurisdiction. That is the whole reason our number does not turn into a change order in month three, and it is the section below.
The code Hays actually adopted
Hays adopted the 2024 IBC under Ordinance No. 4069, passed 27 March 2025, and the 2024 IFC under Ordinance No. 4093, approved 26 March 2026. Two things about that adoption matter to a bid. The city expressly excluded IBC Chapter 11 and Chapter 13, so there is no adopted energy code in Hays at all, and Kansas has no statewide building or energy code to fall back on. The IBC amendments in Ordinance 4069 cover only the Group A-2 sprinkler thresholds at 903.2.1.2 and the fixture counts at 2902, so Chapter 7 and Chapter 17 apply as written. The statewide floor is the Kansas Fire Prevention Code at K.A.R. 22-1-3, which adopts the 2006 IFC and 2006 IBC by reference.
Hays is in Climate Zone 4A (Ellis County), which is what sets the envelope side of the job. We price the assembly on your drawings against the edition this jurisdiction enforces, not the model code.
Hays work you can drive past

Hays Medical Center
When Hays Medical Center needed serious fire protection, they called us for a hybrid scope of intumescent coatings and spray-applied fireproofing. Hospitals can't afford to take chances, so every beam and column in our scope got the specified thickness of the listed system, verified and documented before we left.
What we are usually doing in Hays
Healthcare, Fort Hays State construction, municipal buildings, and agricultural-industrial and cold storage across Ellis County and western Kansas.
Five services across Kansas
One subcontractor, one submittal package, one company answering for the fire protection and insulation scope on your job.
01Spray-Applied Fireproofing
SFRM for beams, columns, joists and deck, self-performed across Kansas.
Schools and universities, Hospitals and medical office, Data centersSee the service →
02Intumescent Fireproofing
Rated coatings for exposed steel, self-performed across Kansas.
Lobbies and atriums, Arena and stadium concourses, Airport terminalsSee the service →
03K-13 Sprayed Fiber Insulation
Thermal and acoustic in one pass, self-performed across Kansas.
Gyms and field houses, Natatoriums, Cafeterias and commonsSee the service →
04Spray Foam Insulation
Closed and open cell, commercial envelope, self-performed across Kansas.
Backyard shops and barns, Barndominiums and garages, Homes and additionsSee the service →
05Core-Fill Masonry Insulation
Foam-in-place for CMU cores, self-performed across Kansas.
Schools and gyms, Churches, Fire stationsSee the service →Hays questions
Do you actually work in Hays, or just bid it?
Hays Medical Center is ours. Hays Medical Center is on our projects page. It took a hybrid scope, intumescent coatings and spray-applied fireproofing on the same building.
Which code edition applies in Hays?
Hays adopted the 2024 IBC under Ordinance No. 4069, passed 27 March 2025, and the 2024 IFC under Ordinance No. 4093, approved 26 March 2026. Two things about that adoption matter to a bid. The city expressly excluded IBC Chapter 11 and Chapter 13, so there is no adopted energy code in Hays at all, and Kansas has no statewide building or energy code to fall back on. The IBC amendments in Ordinance 4069 cover only the Group A-2 sprinkler thresholds at 903.2.1.2 and the fixture counts at 2902, so Chapter 7 and Chapter 17 apply as written. The statewide floor is the Kansas Fire Prevention Code at K.A.R. 22-1-3, which adopts the 2006 IFC and 2006 IBC by reference.
What climate zone is Hays in?
Climate Zone 4A, Ellis County. That is the figure the adopted energy code keys off, and it drives the insulation specification and which side of the assembly the vapour control belongs on.
How fast can you mobilize to Hays?
Hays sits on the Kansas rotation with Wichita, Salina and the Kansas City metro. It is regular work rather than a special trip.
Do you sub the work out in Hays?
No. Our own crews and our own equipment come to Hays. Nobody local is carrying our name on your project, which is why the install standard is the same here as it is on a job outside our own front door.
What do you need to give me a number?
Drawings with the rated assemblies, the spec sections for the systems in our scope, the substrate, the areas by square foot and the bid due date. If the documents are unclear we ask rather than guess.
What states do you work in?
Texas, Oklahoma, Kansas, Arizona, Minnesota and Wisconsin, out of Round Rock, Texas. We travel for the right project and we are prequalified with national and regional general contractors across the territory.
Are you prequalified, bonded and insured?
Yes. We carry commercial general liability, auto, workers compensation and umbrella coverage, and we go through GC prequalification regularly. Send us your prequal packet and insurance requirements with the bid documents and we will return them completed.
The rest of Kansas
Hays is one market. The state page has the full picture, the other cities we cover and how the code situation works across Kansas.
From the Bahl library

IBC Table 601 fire resistance ratings
Read the guide →
SFRM special inspection: what IBC Chapter 17 requires
Read the guide →
How to specify intumescent fireproofing
Read the guide →
Commercial fireproofing cost per square foot
Read the guide →This page describes Bahl Fireproofing's scope of work and general code context. Requirements, adopted code editions and inspection procedures vary by jurisdiction and project; confirm them with your licensed architect or engineer and the authority having jurisdiction. Nothing here is a warranty of a building's compliance or a substitute for the approved construction documents.
Bidding a Hays project?
Call, email, or send the drawings through the form. All three land in the same place, and Ross reads them.