
Work you can
drive past.
Thirteen commercial fireproofing and insulation projects across Texas, Oklahoma and Kansas. Schools, hospitals, athletics and big-box retail, named and located, because a portfolio you can check beats a claim you have to take on faith.
Our
Portfolio
These are jobs our own crews installed. The client is named, the city is named, and the scope says which system went on the steel.
We do not list work we did not self-perform, and we do not list a city we have not worked in. If you want a reference on any project on this page, ask and we will put you in touch with the general contractor.
Thirteen projects, three states

Celina Fire Station No. 3
The city of Celina, as well as the contractors we worked with on this project, knew they were hiring the best from the beginning. Trusted by firefighters!

Hays Medical Center
When Hays Medical Center needed serious fire protection, they called us for a hybrid scope of intumescent coatings and spray-applied fireproofing. Hospitals can't afford to take chances, so every beam and column in our scope got the specified thickness of the listed system, verified and documented before we left.

Dustin R. Womble Basketball Center
Texas Tech called us in for the fireproofing at the Dustin R. Womble Basketball Center. Long-span steel, tight ceilings, and a hard finish date. We installed the specified fire-resistive system across the structure and got out of the next trade's way.

Shannon Women's and Children's Hospital
When Shannon Women's and Children's Hospital needed reliable fire protection, they trusted us with the fireproofing. Our crew delivered full coverage across the scope, working around an active healthcare environment.

UT Health San Antonio
When UT Health San Antonio needed fireproofing, they turned to us. We installed the specified fire-resistive systems throughout our scope on an occupied-campus schedule, with the documentation the project required.

Dick's House of Sport
Dick's brought us in to install multiple fireproofing products across the store, protecting the structural steel with fire-resistive systems installed to the listed design.

Scheels
When you are running a Scheels in Tulsa with millions in inventory on the floor, you do not cut corners on fire protection. They brought us in for the intumescent fireproofing on the structural steel.

Melissa High School
When it came to protecting Melissa High School, they knew who to call for intumescent and spray-applied fireproofing. Every beam and column in our scope got the specified system at the specified thickness, on a school schedule that doesn't move.

Sumeer Elementary
When it came to the students of Sumeer Elementary, the contractor knew who to trust. Lee Lewis called us in to handle the K-13 sprayed insulation, and we delivered.

Plainview Elementary
Providing for the kids of Plainview Elementary isn't just a job, it's a responsibility. That's why Lee Lewis trusted us with their K-13 thermal insulation. We don't take that lightly.

Igo Elementary
Igo Elementary trusted us with the K-13 thermal insulation. Our crew covered the whole school, giving teachers a quieter, better-controlled room to teach in.

Kappa Kappa Gamma
When Kappa Kappa Gamma needed fireproofing for their house, we were called in to make sure it was done right. We handled the full fireproofing scope on the building, start to finish.

Waste Management
When you are parking millions of dollars in equipment in one building, you need the best fireproofing possible, so they called us.
A portfolio you can check.
Not a claim you have to take.
Every project on this page names the building and the city, and a general contractor can call any one of them. It is not the whole list. A lot of what we install sits under confidentiality agreements we do not break, so what you see here is the work we are free to put a name to.
Fireproofing and insulation by state
Austin, Dallas-Fort Worth, Houston, San Antonio, Lubbock
Fireproofing and insulation in Texas →Oklahoma City, Tulsa
Fireproofing and insulation in Oklahoma →Wichita, Kansas City metro, Hays
Fireproofing and insulation in Kansas →Phoenix, Tucson
Fireproofing and insulation in Arizona →Minneapolis, St. Paul, Rochester, Duluth, Brainerd, Walker, Bemidji
Fireproofing and insulation in Minnesota →Milwaukee, Madison, Green Bay, Superior
Fireproofing and insulation in Wisconsin →Questions about our work
Do building codes in Texas, Oklahoma or Kansas require fireproofing for my project?
It depends on the construction type and occupancy, not on the state. IBC Table 601 sets the required fire-resistance ratings by construction type, and the state or city adopts an edition of the IBC that governs your job. Send the drawings and the spec section and we will tell you what the adopted edition asks for on that building.
What fireproofing materials hold up best in our region's weather?
Whether you are dealing with Texas heat, Oklahoma humidity or Kansas freeze-thaw cycles, we select products whose listings cover the service conditions on your job: interior conditioned, interior unconditioned, or exterior exposure. The wrong product in the wrong exposure fails early. We do not do that.
Can your team handle big commercial jobs across Texas, Oklahoma and Kansas?
Hospitals like Hays Medical Center and Shannon Women's and Children's. University athletics at Texas Tech. Big-box retail like Dick's and Scheels in Tulsa. Schools from Melissa to Plainview to Jarrell. Our crews have handled just about every type of large-scale fireproofing project imaginable, on schedule and to specification.
How quickly can you mobilize for a new job in Texas, Oklahoma or Kansas?
We know construction does not wait. In these three states we can usually get started within a week or two. Arizona, Minnesota and Wisconsin are planned mobilizations rather than same-week ones, so tell us the schedule early. Either way you get a real date, not a hopeful one.
Will fireproofing disrupt our jobsite or slow down the project?
We plan ahead and coordinate with your team and the other trades to keep the job moving, not make it harder. We are known for working clean, respecting everyone's schedule, and leaving the site in good shape.
Is this every job you have done?
No. It is every job we can name. A large share of our work sits under confidentiality agreements with the general contractor or the owner, and we do not break those to fill out a web page. If you want references in a particular state or building type, ask and we will get you what the agreements allow.
From the Bahl library

IBC Table 601 fire resistance ratings
Read the guide →
SFRM special inspection: what IBC Chapter 17 requires
Read the guide →
Data center fireproofing and critical infrastructure
Read the guide →
Commercial fireproofing cost per square foot
Read the guide →This page describes Bahl Fireproofing's scope of work and general code context. Requirements, adopted code editions and inspection procedures vary by jurisdiction and project; confirm them with your licensed architect or engineer and the authority having jurisdiction. Nothing here is a warranty of a building's compliance or a substitute for the approved construction documents.
Want a job like these on your schedule?
Call, email, or send the drawings through the form. All three land in the same place, and Ross reads them.
