# ASTM E605: How SFRM Thickness and Density Are Verified

- [Ross Bahl](https://bahlfireproofing.com/author/rossbahl/)
- November 10, 2026
- 10:00 am

Astm e605: how sfrm thickness and density are verified 1

ASTM E605 is the test method a special inspector uses to measure the thickness and density of spray-applied fireproofing. This article covers how thickness readings are taken, how density samples are cut and measured, how results are judged, and where the required numbers come from. The inspector is an independent third party hired by the owner, never the applicator.

**TLDR:** ASTM E605 tells an inspector how to measure spray fireproofing. It does not tell you what thickness or density your building needs, and by its own scope it sets no level of performance. Those numbers come from the UL design, and the building code adds the sampling rate and the acceptance rule. Most fights over a thin or light reading are really about which number it was compared to.

---

## When an ASTM E605 Result Goes Against the Job

Picture a general contractor on a school addition. The inspector’s report shows one density sample from the second-floor beams at 14.5 pcf, noted against a 15 pcf requirement. The superintendent reads that as a failure and asks for the floor to be torn out and resprayed before the ceiling grid goes in.

Maybe that is right. But if the job is CAFCO 300 under UL Design No. D902, the design sets a minimum average density of 15 pcf and a minimum individual density of 14 pcf. One sample at 14.5 pcf clears the individual floor, and the average decides the rest.

Tearing out fireproofing that passed costs a week. Covering fireproofing that failed costs far more, later. Both mistakes start the same way: reading an E605 number without knowing which requirement it belongs to.

## What I See When Fireproofing Readings Get Disputed

I have been in this trade for over forty years, and when a reading goes against a job, the first suspect is always the crew or the gauge. Sometimes the material really is thin, and it gets built up and tested again. More often, in my experience, the reading was fine and the comparison was wrong. A density gets held against a data sheet minimum instead of the UL design’s, or a thickness gets read against an old shop drawing.

The trade association sees the same thing. The National Fireproofing Contractors Association’s density bulletin says contractors are often asked to resolve field densities below the UL design minimum, and that virtually all of those issues resolve once the displacement method is used.

So here is the point of this article. ASTM E605 is a measuring method. The required number comes from somewhere else, and you have to know where before a reading means anything.

## What Is ASTM E605?

ASTM E605/E605M is the standard test method for measuring the thickness and density of sprayed fire-resistive material (SFRM) on structural members. It covers sprayed fiber and cementitious products, in the lab and in the field. Its scope says plainly that it does not establish levels of performance.

The current edition is [ASTM E605/E605M-19, reapproved in 2023](https://store.astm.org/e0605_e0605m-19r23.html), maintained by ASTM Committee E06. Bond strength is a separate test, ASTM E736 for cohesion and adhesion, which sits beside E605 rather than inside it.

In 2025 ASTM added E3431, a practice for on-site inspection of installed SFRM, which also says it sets no performance criteria. NFCA proposed adding it to the 2027 IBC and deleting the code’s measurement patterns that duplicate E605, while keeping the code’s own sampling and acceptance rules where they are stricter. NFCA’s August 2026 code update reports that proposal was finally disapproved, so the measurement patterns and acceptance rules stay as they are. One smaller 2027 change did go through: Section 1705.15 now bases SFRM special inspections on the manufacturer’s installation instructions as well as the approved construction documents, so the inspector also checks the conditions those instructions set, such as the application environment and substrate temperature. None of the states we serve has adopted the 2027 IBC yet.

## How Is Spray Fireproofing Thickness Measured?

The inspector pushes a depth gauge through the fireproofing to the steel at a set pattern of points around each sampled member, then records and averages the readings. On a beam the pattern is nine points around the section at each end of a 12-inch length. A joist gets seven, and a wide-flange column gets twelve.

The gauge is simple. In a letter reproduced in NIST’s World Trade Center report, the Port Authority, the towers’ owner, described a needle on a measured scale. It goes in until it stops at the steel, and the inspector records the depth.

The 2024 IBC spells out the patterns under Section 1705.15.4:

- **Beams and girders:** nine locations at each end of a 12-inch length.
- **Joists and trusses:** seven. NIST described the older E605 figure as two on the top chord, two on the web, three on the bottom chord.
- **Wide-flange columns:** twelve.
- **Hollow structural section and pipe columns:** at least four.
- **Cellular and fluted deck:** at least four readings set symmetrically in a 12-inch square. On fluted deck they include a valley, a crest and the sides, and the average is reported.

NFCA’s 2024 code change proposal described most of those patterns as duplicated in E605, and the hollow section and pipe pattern as code-only.

## How Is SFRM Density Measured?

Density is mass divided by volume, measured on a piece of cured fireproofing cut from the member. The mass is easy. The volume is where results go wrong, and there are two ways to get it.

**The direct method.** The inspector takes thickness readings over the sample area, cuts out a rectangle, and measures its length and width. Volume is length times width times average thickness. NIST’s summary of the 2000 edition used 12 thickness readings for that average, then divided the equilibrium mass by the volume.

**The displacement method.** [NFCA Bulletin 1006 on fireproofing density measurements](https://www.nfca-online.org/assets/docs/GI1006%20Ensuring%20Accurate%20Fireproofing%20Density%20Measurements.pdf) explains why it exists. Before 1993, the thickness-based method carried a large error, because a sprayed texture makes a true average thickness hard to measure. A 1991 study at UL found that measuring volume by displaced beads was more reliable, and ASTM adopted it as an alternate within E605. The bulletin’s procedure:

1. Confirm the material is cured, and check moisture against the manufacturer’s maximum.
1. Cut a sample of at least 8 cubic inches (131 cm3); larger is more accurate.
1. Weigh it to the nearest 0.1 gram.
1. Measure the volume of beads it displaces in a 400 ml beaker.
1. Density in pcf equals grams times 62.43, divided by cubic centimeters.
1. Report the average of three determinations.

The bulletin notes that old field densities ran 18 to 19 pcf, well above UL minimums, so the error rarely mattered; material sprayed closer to its minimum leaves far less room. The federal guide specification, UFGS 07 81 00, allows E605 or the alternate density method in AWCI Technical Manual 12-A, Appendix A.

## How the Readings Are Judged: Where the Required Numbers Come From

The pass line for thickness comes from the UL design, applied through the code. In the 2024 IBC, Section 1705.15.4 allows no more than 10 percent of readings below the design thickness. No reading may fall below the minimum allowable: design thickness less 1/4 inch at one inch and over, or less 25 percent under one inch. On a 1-1/2 inch design, nothing may read under 1-1/4 inch.

Density works the same way. Section 1705.15.5 of the 2024 IBC requires density not less than the density in the approved fire-resistance design. In UL Design No. D902, that is 15 pcf average and 14 pcf individual for CAFCO 300, and 22 and 19 pcf for CAFCO 400. GCP’s Monokote MK-6/HY data sheet takes the greatest of the manufacturer’s requirement, the UL listing, the authority having jurisdiction, or a 15 pcf average.

This table sorts the numbers in a fireproofing inspection report by where each comes from.

Item What ASTM E605 provides What the 2024 IBC adds What the UL design or spec adds

Thickness reading Gauge method Readings against the approved design Required thickness per member

Member pattern Beam, joist and column patterns Hollow section and pipe pattern Not covered

Deck pattern 12-inch square readings Same pattern in code text Deck type sets thickness

Thickness sampling Its own minimum Four per 1,000 sq ft; 25 percent of members per floor Spec may ask for more

Thickness acceptance No performance level 10 percent rule and minimum allowable The design thickness

Density method Direct or displacement Names E605 Spec may name a method

Density sampling Its own minimum One per 2,500 sq ft per assembly and member type, each story Spec may ask for more

Density acceptance No performance level Not less than design density Average and individual minimums

Bond strength Not covered (ASTM E736) 150 psf, higher in high-rises Product may require more

Read it by column: E605 supplies the method, and the last column supplies the answer.

## Why One Reading Never Tells the Story

The number that explains this method comes from [NIST NCSTAR 1-6A, the passive fire protection volume of its World Trade Center investigation](https://nvlpubs.nist.gov/nistpubs/Legacy/NCSTAR/ncstar1-6a.pdf). NIST analyzed 256 individual thickness readings on floor trusses upgraded to a specified 1-1/2 inches. They averaged 2.5 inches with a standard deviation of 0.6 inch, and 0.4 inch of spread sat within single trusses.

In plain terms, readings on one member typically strayed about four-tenths of an inch from that member’s own average, on material sprayed well over its requirement. That is normal for a sprayed product, and it is why E605 reads around the whole section at two cross sections, and why the code judges both how many readings fall short and whether any falls below the floor.

So one thin reading is not automatically a failure, and a good average is not automatically a pass. Sampling frequency belongs to the code, and the 2024 IBC samples far more heavily than the 1993 edition of E605. NIST quotes that edition as one bay per floor, or one per 10,000 square feet, whichever gives more tests.

## Who Takes the Readings, and What to Ask For

The readings belong to the special inspector, a fully independent third party, never to Bahl. Under IBC Section 1704.2 (2018 edition), the owner or the owner’s agent, other than the contractor, hires the approved agency. GCP’s MK-6/HY sheet agrees: an independent lab, selected by the architect and paid by the owner, verifies thickness and density.

NFCA 100, the association’s SFRM application practice, has sprayers spot-check thickness with gauges as they work, but correct thickness is confirmed by a third-party independent inspection agency.

Ask for individual readings and their locations, not just averages, because one thin flange tip and a thin member call for different fixes. For repairs, UFGS 07 81 00 is a good model: add material or respray with the same product, then test the area again.

## Reading an E605 Report in Oklahoma, Kansas and Texas

Oklahoma adopted the 2024 IBC as its statewide minimum for commercial construction, effective September 14, 2026. The Oklahoma Uniform Building Code Commission expressly chose not to adopt the 2021 edition and revoked its old Chapter 17 modification. So SFRM inspection on Oklahoma work moved from 2018 IBC Section 1705.14 to 2024 IBC Section 1705.15.

In Kansas, look at the city. Lenexa’s special inspection program, revised in August 2026, still points to Chapter 17 of the 2018 IBC, so its SFRM section is 1705.14. In North Texas, NCTCOG publishes special inspection documents for the 2018, 2021 and 2024 codes, and each city uses the set matching its adoption.

Humidity is the other variable. A density sample has to come from cured material, and NFCA’s procedure checks moisture first. GCP’s MK-6/HY sheet calls for four fresh air changes per hour in enclosed areas lacking natural ventilation, until the material is substantially dry. In a closed-in Texas building in August, NFCA 100 makes that ventilation part of the GC’s site conditions. Other states in our territory adopt on their own schedules, so check the edition first.

## A Checklist Before the Inspector Arrives

1. **Put the UL design number** and its average and individual density minimums on the inspection request.
1. **Hand over the approved shop drawings**, not the bid set.
1. **Agree on the density method** with the agency before testing.
1. **Schedule inspection floor by floor**, ahead of mechanical, electrical and ceiling work.
1. **Ask for individual readings** and locations in every report.

## Frequently Asked Questions

**What is ASTM E605 thickness testing?** It is the test method for measuring how thick spray-applied fireproofing is on a structural member. The inspector inserts a depth gauge through the material to the steel at a fixed pattern of points. The required thickness comes from the UL design, and the code sets the acceptance rule.

**How is spray fireproofing thickness verified by a special inspector?** An independent inspector hired by the owner takes gauge readings around sampled members and across sampled deck areas. Under the 2024 IBC, no more than 10 percent of readings may fall below the design thickness. None may fall below the minimum allowable thickness.

**How is SFRM density tested in the field?** A piece of cured fireproofing is cut out and weighed, and its volume is found from its dimensions and average thickness or by bead displacement. Density in pcf is mass divided by volume. NFCA’s displacement procedure reports the average of three determinations.

**What happens when a density sample comes back low?** Check it against the UL design’s minimum average and minimum individual density for the product installed, and confirm the sample was cured. If the floor truly falls short, the area is corrected and tested again.

**Does ASTM E605 cover intumescent coatings?** No. E605 covers sprayed fiber and cementitious SFRM. Intumescent coatings fall under a different IBC section, and their field testing follows AWCI Technical Manual 12-B, the practice for thin-film intumescent materials.

**Who pays for ASTM E605 testing?** On most private work the owner does, because the owner hires the special inspector, and GCP’s data sheet says the owner pays the lab. Federal guide specifications can shift the cost to the contractor, but the lab stays independent.

## Key Takeaways

**ASTM E605 is a measuring method.**

- It covers SFRM thickness and density, in the lab and the field.
- Its scope says it does not establish levels of performance.

**Thickness readings follow fixed patterns.**

- Beams nine, joists seven, wide-flange columns twelve, at each end of a 12-inch length.
- Deck readings come from a 12-inch square.

**Density depends on how volume is measured.**

- Direct uses dimensions and average thickness; displacement uses beads.
- NFCA’s procedure needs at least 8 cubic inches and averages three results.

**The required numbers come from the design.**

- 2024 IBC: no more than 10 percent of readings below design thickness, none below the minimum allowable.
- UL Design No. D902 with CAFCO 300: 15 pcf average, 14 pcf individual.

**Single readings scatter.**

- NIST found 0.4 inch of spread within single trusses averaging 2.5 inches.
- Judge the population and the floor, not one reading.

**The inspector is independent.**

- The owner hires the agency; SFRM thickness and density are never verified by Bahl.
- Ask for individual readings and locations.

## Related Reading

- [SFRM Density Categories: Low, Medium, and High Density Explained](https://bahlfireproofing.com/sfrm-density-categories-explained/) covers what the density classes mean and where each is used.
- [Why Surface Preparation Matters in Commercial Fireproofing](https://bahlfireproofing.com/why-surface-preparation-matters-in-commercial-fireproofing/) explains the substrate work that comes before any reading.

If you want spray fireproofing applied to the thickness your UL design calls for, at a density that clears both its average and individual minimums, and ready for the inspector before the ceiling closes in, that is the work we do throughout Texas, Oklahoma, Kansas, Nebraska, Minnesota, Wisconsin, Arizona, Missouri, and Iowa. Bahl Fireproofing is an approved applicator for the fireproofing and spray foam manufacturers whose products we install, and our own crews apply every product to the manufacturer’s application instructions. Call me at 512-387-2111, email ross@bahlfireproofing.com, or [Contact Bahl Fireproofing](https://bahlfireproofing.com/contact/) to get on the schedule. Our [spray-applied fireproofing services](https://bahlfireproofing.com/fireproofing/) page covers what we install, and our [service areas](https://bahlfireproofing.com/service-areas/) page shows where we work.

---

*This article provides general educational information about ASTM E605 testing and special inspection of spray-applied fireproofing, and it is not engineering, legal or code-compliance advice. It does not replace project-specific direction from a licensed architect or engineer. Code citations reference a specific edition, and inspection requirements are set by the authority having jurisdiction and the project’s approved documents. Required thickness and density depend on the listed assembly and correct installation, so confirm them against the current UL design and the manufacturer’s latest published data sheet. Installation must follow the manufacturer’s written instructions and be performed by a qualified applicator.*

Written for Bahl Fireproofing**Ross Bahl, Owner**

Ross owns Bahl Fireproofing, the commercial fireproofing and insulation subcontractor his family started in 1977. Every code figure on this site is checked against the published source before it goes up. [More about Ross](/ross-bahl/).

[PrevPreviousK-13 Auditorium Ceilings: Why NRC Is Not Enough](https://bahlfireproofing.com/k-13-auditoriums-performing-arts/)

[NextMinneapolis Fireproofing Contractor for the Twin CitiesNext](https://bahlfireproofing.com/minneapolis-st-paul-commercial-fireproofing-contractor/)

On this page

Bidding this scope?**Send us the drawings.**

Spray-applied fireproofing, intumescent coatings, K-13, spray foam and Core Foam, self-performed across nine states. We price the assembly on your drawings, not a square-foot guess.

[Request a bid](/contact/)[Call the office512-387-2111](tel:512-387-2111)

### Have a rated assembly to cover?

Send the drawings and the spec section. We come back with the scope in and the scope out stated plainly, so your bid tab compares the same work across every subcontractor on it.

[Call the office512-387-2111](tel:512-387-2111)[Request a bid](/contact/)

## Keep reading

### [Cold Weather Fireproofing: Temperature Limits by Product](https://bahlfireproofing.com/cold-weather-fireproofing-temperature-limits/)

November 20, 2026

Winter steel schedules put spray fireproofing and intumescent coatings into buildings that are not closed in or heated yet. This article lays

 [Read the guide](https://bahlfireproofing.com/cold-weather-fireproofing-temperature-limits/)

### [Spray Foam for Pole Barns and Shops in Minnesota](https://bahlfireproofing.com/spray-foam-pole-barns-shops-minnesota/)

November 18, 2026

Spray foam for pole barns in Minnesota is a condensation job before it is an R-value job. This article covers why warm

 [Read the guide](https://bahlfireproofing.com/spray-foam-pole-barns-shops-minnesota/)

### [One Fireproofing and Insulation Subcontractor: When It Fits](https://bahlfireproofing.com/fireproofing-and-insulation-subcontractor/)

November 16, 2026

Hiring one fireproofing and insulation subcontractor can take a handoff out of the schedule, or it can leave a hole in the

 [Read the guide](https://bahlfireproofing.com/fireproofing-and-insulation-subcontractor/)

```json
{"@context":"https:\/\/schema.org","@graph":[{"@type":"Service","@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/#industry","name":" Fireproofing","url":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/","serviceType":"Commercial Fireproofing","provider":{"@id":"https:\/\/bahlfireproofing.com\/#organization"},"areaServed":[{"@type":"State","name":"Texas"},{"@type":"State","name":"Oklahoma"},{"@type":"State","name":"Kansas"},{"@type":"State","name":"Arizona"},{"@type":"State","name":"Wisconsin"},{"@type":"State","name":"Minnesota"},{"@type":"State","name":"Nebraska"},{"@type":"State","name":"Missouri"},{"@type":"State","name":"Iowa"}],"isRelatedTo":[{"@type":"Service","name":"Intumescent Fireproofing","url":"https:\/\/bahlfireproofing.com\/intumescent-fireproofing\/"},{"@type":"Service","name":"Spray-Applied Fireproofing","url":"https:\/\/bahlfireproofing.com\/fireproofing\/"},{"@type":"Service","name":"Cementitious Fireproofing","url":"https:\/\/bahlfireproofing.com\/cementitious-fireproofing\/"}]},{"@type":"BlogPosting","@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/#blogposting","headline":"ASTM E605: SFRM Thickness And Density Testing Explained","description":"ASTM E605 explained: how a special inspector measures spray fireproofing thickness and density, how samples are averaged, and where the pass line comes from.","url":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/","datePublished":"2026-11-10T10:00:00-06:00","dateModified":"2026-11-20T14:52:30-06:00","image":{"@type":"ImageObject","url":"https:\/\/bahlfireproofing.com\/wp-content\/uploads\/2026\/10\/astm-e605-sfrm-thickness-density-hero.webp"},"author":{"@type":"Person","@id":"https:\/\/bahlfireproofing.com\/ross-bahl\/#person","name":"Ross Bahl","url":"https:\/\/bahlfireproofing.com\/ross-bahl\/","jobTitle":"Owner"},"publisher":{"@type":"Organization","@id":"https:\/\/bahlfireproofing.com\/#organization","name":"Bahl Fireproofing, LLC","url":"https:\/\/bahlfireproofing.com\/","logo":{"@type":"ImageObject","url":"https:\/\/bahlfireproofing.com\/wp-content\/uploads\/2025\/02\/7ae06-be6a6e71-7409-4c8c-bc8b-c64bc18f6b39-removebg-preview.png"}},"mainEntityOfPage":{"@type":"WebPage","@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/"},"articleSection":"Fireproofing","keywords":"commercial fireproofing, SFRM, intumescent","about":[{"@type":"Thing","name":"Commercial Fireproofing"},{"@type":"Thing","name":"Fire-Resistive Construction"}],"name":"ASTM E605: SFRM Thickness And Density Testing Explained"},{"@type":"Organization","@id":"https:\/\/bahlfireproofing.com\/#organization","name":"Bahl Fireproofing","sameAs":["https:\/\/network.procore.com\/p\/bahl-fireproofing-llc-round-rock","https:\/\/subcontractorsaustintexas.com\/company\/bahl-fireproofing-llc\/","https:\/\/www.yelp.com\/biz\/bahl-fireproofing-round-rock","https:\/\/www.buzzfile.com\/business\/Bahl-Fireproofing-LLC-512-387-2111","https:\/\/members.asaonline.com\/directory\/Details\/bahl-fireproofing-llc-2594032","https:\/\/www.manta.com\/c\/mm70y4c\/bahl-fireproofing-inc","https:\/\/www.nfca-online.org\/index.php?option=com_community&amp;view=profile&amp;userid=2018789809&amp;module=view-all&amp;uuid=f0c1d73b-33e3-4f07-bc9a-acef2520da51&amp;current_page=0&amp;directory_search_id=2006651#\/profile"],"logo":{"@type":"ImageObject","@id":"https:\/\/bahlfireproofing.com\/#logo","url":"https:\/\/bahlfireproofing.com\/wp-content\/uploads\/2025\/02\/7ae06-be6a6e71-7409-4c8c-bc8b-c64bc18f6b39-removebg-preview.png","contentUrl":"https:\/\/bahlfireproofing.com\/wp-content\/uploads\/2025\/02\/7ae06-be6a6e71-7409-4c8c-bc8b-c64bc18f6b39-removebg-preview.png","caption":"Bahl Fireproofing","inLanguage":"en-US","width":"312","height":"59"}},{"@type":"BreadcrumbList","@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":"1","item":{"@id":"https:\/\/bahlfireproofing.com","name":"Home"}},{"@type":"ListItem","position":"2","item":{"@id":"https:\/\/bahlfireproofing.com\/blog\/","name":"Blog"}},{"@type":"ListItem","position":"3","item":{"@id":"https:\/\/bahlfireproofing.com\/category\/fireproofing-blog\/","name":"Fireproofing"}},{"@type":"ListItem","position":"4","item":{"@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/","name":"ASTM E605: How SFRM Thickness and Density Are Verified"}}]},{"@type":"WebPage","@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/#webpage","url":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/","name":"ASTM E605: SFRM Thickness And Density Testing Explained","datePublished":"2026-11-10T10:00:00-06:00","dateModified":"2026-11-20T14:52:30-06:00","isPartOf":{"@id":"https:\/\/bahlfireproofing.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bahlfireproofing.com\/wp-content\/uploads\/2026\/10\/astm-e605-sfrm-thickness-density-hero.webp"},"inLanguage":"en-US","breadcrumb":{"@id":"https:\/\/bahlfireproofing.com\/astm-e605-sfrm-thickness-density\/#breadcrumb"}}]}
```